General Contractor:Reliance Construction
Architect:KFA Karl Fischer Architect
Floor Area:6 floors total 40 000 sq. ft.
Product :3/8" of LATICRETE Supercap SC500
Year of completion:2011

Issues

Condos Wilson is settled in the old sector of Paper Hill in Montreal. Following the demolition, the floors were in very poor condition. We had to fully level the floors because of the many different levels. Various floor coverings were used on the floor, whose epoxy.

Solution

We made the application of our product based cement. The epoxy applicator specially prepared floors in corridors ready to receive transparent epoxy.

Results

The result is impeccable!

The Project in Images

Condos Wilson
Condos Wilson
Condos Wilson
Condos Wilson
Condos Wilson