General Contractor:Avicor
Floor Area:2 floor total of 43 000 sq. ft.
Product :5/8’’ of LATICRETE Supercap SC500
Year of completion:2014

Issues

Building floors had been leveled by another subcontractor. However, the result was not up to the customer expectations. So we made a survey of the slab which allowed us to see that there were still very high points and low points in very, preventing the installer of glass doors to do its job.

Solution

We had to scarification in several places and we adjusted the level to the floor and existing doors.

Result

After our intervention, the application of glass doors was done properly and the result is outstanding.